3 traveling machinery assembly, 1 machinery sizes 3-5 – R&M Materials Handling WIRE ROPE PACKAGES User Manual
Page 21
![background image](/manuals/286991/21/background.png)
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
21/76
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
3 Traveling machinery assembly
3.1 Machinery sizes 3-5
Pos. Name
Specification
Amount
1
End carriage
2
2
Washer
DIN125-A8-A3G (Machinery sizes 3 and 4)
DIN6796-A12-A3G (Machinery size 5)
8+8
3
Screw
DIN912-M8x85-8.8-A3G (Machinery size 3)
DIN912-M8x100-8.8-A3G (Machinery size 4)
DIN912-M12x140-8.8-A3G (Machinery size 5)
8+8
4 Traveling
machinery
2
• Clean splines and mounting flanges from dirt and rust protection wax and grease the shaft lightly
before assembly.
• You can use a plastic hammer to slide drive in. Do not use any metal or lead hammer.
• Tightening torques M8-8.8 23 Nm, M12-8.8 77 Nm.
• Remove the protection pin from the breather plug.