4 crane towing arm assembly, 1 crane towing arm – R&M Materials Handling WIRE ROPE PACKAGES User Manual
Page 25
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
25/76
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
4 Crane towing arm assembly
4.1 Crane
Towing
Arm
13
11
7
8
12
14
4
9
3
10
1
5
6
2
15
c-vr-lb
Pos. Name
Specification
Fixing
variation
Amount
1
Towing arm
CQW-L558
A & B
1
2
Towing arm
CQP-L195W120H135
A & B
1
3
Tube
CQ-L1500W50H50T2
A & B
1
4
Fixing Plate
CQP-L80W80H6
A & B
4
5 Fixing
Plate
(option)
CQP-L150W105H6
B
1
6 C-Profile
(option)
CQP-L500W50H120
B
1
7
Screw
DIN933-M10x20-8.8-A3G
A & B
4
8 Screw
DIN933-M10x35-8.8-A3G
B
4
9
Screw
DIN931-M8x80-8.8-A3G
A & B
4
10
Screw
DIN931-M8x140-8.8-A3G
A & B
4
11
Washer
DIN125-A10-A3G
A / B
4 / 12
12
Washer
DIN125-A8-A3G
A & B
16
13 Nut
DIN985-M10-8-A3G
B
4
14
Nut
DIN985-M8-8-A3G
A & B
8
15 Towing
arm
(option)
*
CQP-L440W41H80
A & B
1
A)
Fixing variation with direct connection to end carriage. When conductor rail power supply type is used either part number 2 or its
fixing parts won’t be needed. It will not matter to the place of the end carriage where the towing arm is attached if the power supply
is flat cable- or the conductor rail type. The cranes towing arm is fixed by the part number 7 to the end carriage.
B)
Variation with the optional fixing part (part number 6).
• If necessary cut off excess length of square tubes.
• There will be several attaching possibilities in the end carriage for the towing arm. Choose the
best suited for the case.
• Notice the differences between variations in the part list.
*
For assembly use either Towing arm part no 2 or 15 (alternative parts).