R&M Materials Handling WIRE ROPE PACKAGES User Manual
Page 49
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
49/76
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
9.2 Chain
hoist
endstop-chain
To assemble the buffer stops:
• Make sure that the buffer hits center (1) of the buffer stop.
• Check, that the buffer stops (2) will stop the hoist on both ends of the crane, not the cable trollies!
• Tightening torques:
- M10
45
Nm
- M12
77
Nm
- M20
170
Nm