Trim installation – Newport Brass 2567 Skylar User Manual
Page 3
Trim Installation
1. Utilizing 3/4” copper pipe, make connections between spout, valves & water supply.
See Figure 4.
Warning: To prevent severe damage to valve body, any solder/braze process must
be performed a min. of 4" from ports.
2. Apply thread sealant to each end of connector HOSE (15) and attach one end to
diverter OUTLET (14). Place a rubber WASHER (16) into each end of decorative
HOSE (17), attaching one end to connector HOSE (15). Pull other end through deck
FLANGE (18) and attach to hand SHOWER (19). Place hand SHOWER (19) into
deck FLANGE (18). See Figure 5.
3. Secure HANDLE (19) into place by first engaging the STEM (20) and then threading
HANDLE (19) onto CARTRIDGE (22). Any adjustments for rotational alignment must
be made to the valve BODY (2), not to the CARTRIDGE (22). Repeat for all handles.
See Figure 6. (Cartridge Bonnet factory torque is 14-16 ft-lbs.)
Figure 4
Inlet
for hot
water
supply
Inlet for cold
water supply
Figure 6
Figure 5
15
14
16
17
Note: Some states require a
ASSE 1016 approved
Tempering Valve installation
with this product. See the fol-
lowing disclaimer for proper
installation.
NWP-1-657
EN-2108
REV -
18
19
22
20
19
21