beautypg.com

Trim installation – Newport Brass 2567 Skylar User Manual

Page 3

background image

Trim Installation

1. Utilizing 3/4” copper pipe, make connections between spout, valves & water supply.

See Figure 4.

Warning: To prevent severe damage to valve body, any solder/braze process must

be performed a min. of 4" from ports.

2. Apply thread sealant to each end of connector HOSE (15) and attach one end to

diverter OUTLET (14). Place a rubber WASHER (16) into each end of decorative

HOSE (17), attaching one end to connector HOSE (15). Pull other end through deck

FLANGE (18) and attach to hand SHOWER (19). Place hand SHOWER (19) into

deck FLANGE (18). See Figure 5.

3. Secure HANDLE (19) into place by first engaging the STEM (20) and then threading

HANDLE (19) onto CARTRIDGE (22). Any adjustments for rotational alignment must

be made to the valve BODY (2), not to the CARTRIDGE (22). Repeat for all handles.

See Figure 6. (Cartridge Bonnet factory torque is 14-16 ft-lbs.)

Figure 4

Inlet

for hot

water

supply

Inlet for cold

water supply

Figure 6

Figure 5

15

14

16

17

Note: Some states require a

ASSE 1016 approved

Tempering Valve installation

with this product. See the fol-

lowing disclaimer for proper

installation.

NWP-1-657

EN-2108

REV -

18

19

22

20

19

21