Recommended Installation by a Professional Contractor

1. Using the table below, measure the appropriate distance between post centers. See Figure 1.

Note: Hole locations should be level.

· 24" Single Towel Bar - 24 5/16"
· 30" Single Towel Bar - 30 5/16"
· Tissue Holder - 6 1/4"

2. Drill hole(s) in wall at points marked using the appropriate drill size:

· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill

3. Fasten FLANGE (1) to finished wall using either WOOD/TOGGLE SCREWS (2). Place

ADAPTER POST (3) into FLANGE (1) at specified height of 2-5/16”. Secure
ADAPTER POST (3) in place with SETSCREW (4). See Figure 2.

5. Place ESCUTCHEON (5), BONNET (6) and NUT (7) over POST (3). See Figure 3.

6a.TOWEL BAR: Assemble TOWEL BAR (9) between END POST (6). Place END

POST (6) onto POST (3). Secure in place with SETSCREW (4). See Figure 4.

6b.TISSUE HOLDER: Place END POST (6) onto POST (3). Secure in place with

SETSCREWS (4). Place HOLDERS (8) between END POSTS (6). See Figure 5.

Towel Bar / Post Tissue Holder

Installation Instructions

Model No.

30-02, 30-03, 30-28

Fig. 1

6

4

Distance between

posts

3

Fig. 2

Fig. 3

Fig. 4

1

2

4

9

6

4

3

8

3

2-5/16

7

5

3

6

Fig. 5