Newport Brass 22-28 User Manual
Towel bar / towel ring / robe hook / tissue holder, Installation instructions
Towel Bar / Towel Ring / Robe Hook / Tissue Holder
Installation Instructions
Model No. 22-01, 22-02, 22-03, 22-09, 22-12, 22-28
Recommended Installation by a Professional Contractor
1. Using the table below, measure the appropriate distance between post centers. See Figure 1.
Note: Hole locations should be level.
· 18" Single Towel Bar - 18 1/8"
· 24" Single Towel Bar - 24 1/8"
· 30" Single Towel Bar - 30 1/8"
· Tissue Holder (2 Post) - 6 1/4"
· Tissue Holder (3 Post) - 6 1/4" (2x), See Figure 2.
2. Drill hole(s) in wall at points marked using the appropriate drill size:
· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill
3. Dis-assemble ESCUTCHEON (5) and FLANGE (1) from END POST (8). Fasten FLANGE
(1) to wall using either WOOD/TOGGLE SCREWS (2). See Figure 3.
4. Engage POST (3) into FLANGE (1). Position POST (3) height to 2 3/16” from mounting
surface. Secure POST (3) into place by tightening SETSCREW (4). See Figure 4.
5. Place ESCUTCHEON (5) over POST (3). See Figure 5.
6a. Towel Bars: Assemble TOWEL BAR (7) between END POST (8). Place END POST (8)
onto POST (3) and secure into place with SETSCREW (4). See Figure 5.
6b. Towel Ring / Garment Hook: Slide END POST (8) onto FLANGE POST (3) and
secure into place with SETSCREW (4). See Figure 6.
6c. Tissue Holder (2 & 3 Post): Place END POST (8) onto POST (3) and secure into place
with SETSCREW (4). Place HOLDER (9) between END POST (8). See Figure 7.
Distance between
posts
Fig. 1
Fig. 2
Fig. 3
2
1
3
1
Fig. 4
Fig. 5
Fig. 7
5
4
8
7
4
3
9
8
8
3
Distance
between
posts
Distance
between
posts
4
8
Fig. 6
2 3/16”
3
4
4
8
3
3