beautypg.com

Newport Brass 22-28 User Manual

Towel bar / towel ring / robe hook / tissue holder, Installation instructions

background image

Towel Bar / Towel Ring / Robe Hook / Tissue Holder

Installation Instructions

Model No. 22-01, 22-02, 22-03, 22-09, 22-12, 22-28

Recommended Installation by a Professional Contractor

1. Using the table below, measure the appropriate distance between post centers. See Figure 1.

Note: Hole locations should be level.
· 18" Single Towel Bar - 18 1/8"
· 24" Single Towel Bar - 24 1/8"
· 30" Single Towel Bar - 30 1/8"
· Tissue Holder (2 Post) - 6 1/4"
· Tissue Holder (3 Post) - 6 1/4" (2x), See Figure 2.

2. Drill hole(s) in wall at points marked using the appropriate drill size:

· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill

3. Dis-assemble ESCUTCHEON (5) and FLANGE (1) from END POST (8). Fasten FLANGE

(1) to wall using either WOOD/TOGGLE SCREWS (2). See Figure 3.

4. Engage POST (3) into FLANGE (1). Position POST (3) height to 2 3/16” from mounting

surface. Secure POST (3) into place by tightening SETSCREW (4). See Figure 4.

5. Place ESCUTCHEON (5) over POST (3). See Figure 5.

6a. Towel Bars: Assemble TOWEL BAR (7) between END POST (8). Place END POST (8)

onto POST (3) and secure into place with SETSCREW (4). See Figure 5.

6b. Towel Ring / Garment Hook: Slide END POST (8) onto FLANGE POST (3) and

secure into place with SETSCREW (4). See Figure 6.

6c. Tissue Holder (2 & 3 Post): Place END POST (8) onto POST (3) and secure into place

with SETSCREW (4). Place HOLDER (9) between END POST (8). See Figure 7.

Distance between

posts

Fig. 1

Fig. 2

Fig. 3

2

1

3

1

Fig. 4

Fig. 5

Fig. 7

5

4

8

7

4

3

9

8

8

3

Distance
between

posts

Distance
between

posts

4

8

Fig. 6

2 3/16”

3

4

4

8

3

3