beautypg.com

Newport Brass 7301 Newport 365 User Manual

Page 3

background image

09/09/2005

Spout Installation: (Reference Figure 2)

Based on finished wall thickness, installer must use appropriate length 1/2-14 NPT NIPPLE (1), not included,
for SPOUT (2) installation.

Apply thread sealant to the threads of the NIPPLE (1) and thread into valve center port inside finished wall.

Thread SPOUT (2) onto NIPPLE (1).

Turn on water supply, check for leaks and make any final adjustments required.

Remove AERATOR (3) from SPOUT (2).

Open valves and flush lines of debris.

Reattach AERATOR (3) to SPOUT (2).

Figure 2

2

1

3