Optional, Warning, Cord management – Peerless-AV PP730 - Installation User Manual
Page 6: Mh 3 aa g
6 of 20
ISSUED: 10-01-07 SHEET #: 095-9272-5 09-02-11
NOTE: Adjustment points (socket screws) are factory torqued for optimal performance. This factory torque setting is
recommended to prevent the display from slipping over time. If more or less tension is desired follow this optional step.
You may not achieve optimal torque value if factory torque settings are adjusted.
If more or less tension is desired in tilt mechanism, remove snap caps as shown in detail 2. Insert a fl at head
screw driver into slot and pry cap away from tilt mechanism:
• To adjust tilt, simply tighten or loosen socket screw no more than half a turn using 5 mm allen wrench (E).
• To adjust roll, simply tighten or loosen 10-32 nylock nut.
OPTIONAL
DETAIL 2
If more or less tension is desired in the arm pivot points, do
the following:
• To increase tension, turn socket screw clockwise with
3/16" allen wrench (I).
• To reduce tension, turn socket screw counter-clockwise with allen
wrench (I).
NOTE: Do not turn more than half a turn.
SOCKET SCREWS
© 2011, Peerless Industries, Inc. All rights reserved.
All other brand and product names are trademarks or registered trademarks of their respective owners.
Peerless Industries, Inc.
2300 White Oak Circle
Aurora, IL. 60502
www.peerlessmounts.com
Attach cable tie anchor (H) to top or bottom of wall arm (AA) using 8-32 x 1/4" screw (M) as shown in fi gure 3.1.
Secure cables to wall arm (AA) using cable tie (G) as shown in fi gure 3.2.
Cord Management
fi g. 3.1
DISPLAY
CABLES
M
H
3
AA
G
fi g. 3.2
10-32 NYLOCK NUT
SNAP CAP
SOCKET SCREW
SLOT
• Do not loosen socket screws or nylock nuts to the point they become disengaged from the mount. Doing so may
cause the display to fall.
WARNING