beautypg.com

Warning, Aa c bb, Caa bb bb – Peerless-AV PRS-EXC-W - Installation User Manual

Page 6

background image

6 of 13

ISSUED: 04-24-08 SHEET #: 055-9256-9 11-21-11

Installation to Wood Joist Ceilings or Wood Stud Walls

NOTE: Wall installation with models PRS-EXC, PRS-EXC-S and PRS-EXC-W is not available.
Use a stud fi nder to locate the edges of the stud or joist. Use of an edge-to-edge stud fi nder is highly
recommended. Based on its edges, draw a vertical line down the stud's or joist’s center. Place ceiling/wall plate
(AA) on wall or ceiling as a template, making sure that the two mounting slots are on the centerline.

For ceiling installation: Opening on outer channel (BB) indicates front of mount. Use the correct mounting slots
on the ceiling/wall plate depending on ceiling joist orientation as shown in fi gure 2.1 and fi gure 2.2. Mounting slots
on ceiling plate allow for 45° (

±

22.5) of rotation before securing to joist.

For wall installation: Opening on outer channel (BB) indicates top of mount.

Mark the center of the two mounting holes. Drill two 5/32" (4 mm) dia. holes 2-1/2" (64 mm) deep. Secure
ceiling/wall plate (AA) to wood stud or joist using two #14 x 2-1/2" wood screws (C) and two 1/4" washers (F)
as shown.

Skip to step 3

• Installer must verify that the supporting surface will safely support the combined load of the equipment and all

attached hardware and components.

• Tighten wood screws so that ceiling/wall plate is fi rmly attached, but do not overtighten. Overtightening can damage

the screws, greatly reducing their holding power.

• Never tighten in excess of 80 in. • lb (9 N.M.).

• Make sure that mounting screws are anchored into the center of the stud or joist. The use of an "edge to edge" stud

fi nder is highly recommended.

• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs or

joists. Installers are responsible to provide hardware for other types of mounting situations (not evaluated by UL).

WARNING

2

AA

C

BB

OPENING ON OUTER
CHANNEL (BB) INDI-
CATES TOP OF MOUNT

fi g. 2.3

WOOD
JOIST

fi g. 2.2

C

AA

OPENING ON OUTER CHANNEL (BB)
INDICATES FRONT OF MOUNT

C

AA

BB

BB

WOOD STUD

fi g. 2.1

CEILING INSTALLATION

WALL INSTALLATION

(EXCEPT FOR PRS-EXC MODELS)

MOUNTING
SLOTS ALLOW
FOR ROTA-
TION BEFORE
SECURING TO
JOIST

F

F

F