Installation instructions, Tools needed part list bill of materials – Daystar KF09124BK User Manual
Page 2
3
Tools Needed
Part List
Bill of Materials
Part No.
Description
Qty
M20151
Front Spacer
2
S20150
Stud extenders
6
S10010
10mm Washer
6
S10292
10mm –1.5 lock nut
6
P11153
Thread lock / Decal
1
Description
Qty
Pry Bar
1
Floor Jack
1
Jack Stands / Wheel chocks
2
Lug Wrench
1
10mm wrench
1
17mm wrench
1
20mm wrench
1
21mm wrench
1
Torque wrench
1
IMPORTANT NOTICE : The advertised amount of lift that this kit
provides and the thickness of the spacers supplied will not be the same!
For example, a 2-1/2” lift may only have 1-1/2” thick spacers. The
reason for the difference between the spacer thickness and the amount
of lift has to do with suspension geometry. There is a ratio involved,
and it is this ratio that determines the thickness of the spacers. Rest
assured, installing the spacer supplied will result in the proper amount
4
Installation Instructions
!Warning: Always work with appropriate personal safety
gear including safety glasses, gloves and hearing protection if
using air powered tools.
Begin by inspecting the components & hardware for dam-
age. Then compare components & hardware to the bill of materi-
als for completeness. If anything is missing/damaged, do not pro-
ceed with the installation. Please, call Daystar Products (800-595-
7659) and we will send you the missing of damaged components
free of charge.
!Caution: Vehicle front end must be raised to install leveling
kit. Using a hydraulic chassis lift will greatly ease installation.
If another jack is used, assure vehicle is level on a firm sur-
face,
in
park
(1st
gear),
rear
wheels
blocked and jack stands in place to support vehicle in case
jack or vehicle shifts.