beautypg.com

Flashing installation, Grain systems formed flashing installation – Grain Systems Bin Flooring PNEG-225 User Manual

Page 19

background image

4. Monorail Installation

PNEG-225 Corrugated Floor and Monorail Layouts

19

Flashing Installation

Figure 4F

Grain Systems Formed Flashing Installation

If bin sweep auger is to be used, overlap flashing such that rotation (usually clockwise) of the sweep will
climb up on the next flashing section. This will prevent the rotating/slipping outer wheel of the sweep
from catching on the flashing edges.

After the floor is in place, lay the flashing pieces on top of the floor place over the 1-1/4" bin bolts.

See Figure 4G

to determine the correct sequence for placing the nuts and washers. Finger tighten the

nuts. While holding flashing flat, fasten the flashing to the floor with sheet metal screws. Now tighten
flashing nuts.

Figure 4G