Grain Systems PNEG-1283 User Manual
Page 10

4. Installation
10
PNEG-1283 Moisture Sampler
12. Install Moisture Sampler discharge cover (D01-2305-8) in top two (2) holes drilled in the box end
using 5/16" bolt (S-6606).
Figure 4F
13. Now install the Moisture Sampler over the two (2) bolts used to install the Moisture Sampler
discharge cover in
and install remaining 5/16" bolt (S-6606) and nuts (S-3611) in the bottom
hole (do not tighten hardware yet). Attach the sensor end using 5/16" bolts (S-8135) and nuts
(S-3611) making sure that the heads of the bolts are on the inside of the discharge box tube. Now
tighten all seven (7) bolts attaching the Moisture Sampler.
14. Remove the four (4) bolts and lock nuts that hold the auger bearing and flangette the discharge box
bearing plate. Flip the auger bearing so that the outside is now the inside, then re-install bearing
flangette and hardware.
15. Before re-installing the discharge box slide the bearing lock collar onto the auger shaft with the
locking side of the collar facing the rear end of the auger shaft.
16. Now slide the discharge box/Moisture Sampler assembly over the auger and re-attach to the
discharge bearing plate on the dryer.
17. Engage the lock collar with the auger bearing and with a hammer and punch strike it in a clockwise
direction to set it with the bearing, then tighten set screw.
Moisture sampler discharge cover