beautypg.com

Hoisting recommendations (continued) – Grain Systems Tanks PNEG-603 User Manual

Page 53

background image

16. Hoisting

PNEG-603 4" Commercial Hopper Tank

53

Hoisting Recommendations (Continued)

3. Before setting tank on hopper structure, make sure poly base sealer has been applied to bottom lip

of tank base angle. Set tank on hopper compression ring and align the holes in stiffener base plates
with the holes in the compression ring. Bolt stiffener base plate, compression ring and support
column top plate with two (2) 5/8" x 2-3/4" hex head bolt per stiffener. Shim all stiffener base plates
with a base angle shim plate. Column/stiffener shims can be used to shim stiffener base plates
when needed. Align 4" bin hold-down with hole in center of compression element and attach with
5/8" x 1-1/2" hex head bolt. Field drill six (6) 3/8" diameter holes in tank sidewall to match pattern in
bin hold-down. Bolt sidewall to hold with 5/16" diameter bin bolt.

(See Figure 16D.)

4. After tank is secured remove the spider or horizontal bracing and all hoisting attachments

and cables.

Figure 16D