9. Sidewall Assembly

38

PNEG-603 4" Commercial Hopper Tank

Caulking and Bolting Sidewall Sheets

Figure 9C Standard Sidewall Sheets (As Viewed from Outside Bin)

1. Install rope caulk to each sheet before it is assembled.

(See Figure 9C.)

2. Using correct size bin bolts throughout, begin assembling sidewall sheets end to end (overlapping

the same way throughout) until the ring is completed. All body sheet bolts are to be installed with the
bolt head and its neoprene washer to the outside and the nut on the inside. Do not tighten bolts
until all sheets are assembled and form a complete ring
.

3. Attach lifting brackets to stiffener bolt holes. These straps, coupled to the jacks will enable you to later

elevate the bin.

4. Now tighten the bolts in sequence, starting from the center and working to the edge in both

directions. This permits the sidewall sheets to draw-up evenly. Complete one ring and stop.

(See Figure 9B on Page 37.)

Tighten from the nut side.

5. You are now ready to assemble the roof. Refer to the roof erection manual for roof assembly