beautypg.com

Rough Country 1154 User Manual

Yj steering brace kit

background image

INSTALLATION INSTRUCTIONS

1. Loosely install the steering brace as shown in Photo 1 to steering box with supplied 3/8” u-bolts and hardware.

Torque to 10 ft/lbs.

2. Position the steering brace over the stock holes in the frame and install the two 7/16” x 3 1/2” bolts with the supplied

crush sleeves through the frame as shown in Photo 2.

3. Check to make sure the steering brace does not interfere with the pitman arm and tighten all fasteners.

92115400

YJ STEERING BRACE KIT

POST INSTALLATION

1. Check all fasteners for proper torque. Check to ensure there is adequate clearance between all rotating, mobile,

fixed and heated members. Check steering for interference and proper working order.

2. Re torque all fasteners after 500 miles. Visually inspect components and re torque fasteners during routine vehicle

service.

Photo 1

Photo 2

Thank you for choosing Rough Country for your Jeep off road needs.

Please read all the instructions before beginning the installation.

PRODUCT USE INFORMATION

We will be happy to answer any questions regarding our products by calling us @ 731-285-9000 .Rough Country will
not be responsible for any product that is altered.