8 Setup

VEGADIF 65 • 4 … 20 mA/HART

36128-EN-130417

+

A

B

6

7

3

2

4

1

5

+

II

I

III

III

Fig. 55: Preferred measurement setup for closed vessels
I VEGADIF 65

II 3-fold valve block

III Separator

1, 5 Drain valves

2, 4 Inlet valves

6, 7 Vent valves on VEGADIF 65

A, B Blocking valves

Proceed as follows:
1. Fill the vessel to just above the lower tap
2. Fill measuring system with medium

Close valve 3: Separate plus and minus side
Open valve A and B: Open block valves

3. Vent plus side (probably empty minus side)

Open valve 2 and 4: Discharge medium on the plus side
Briefly open valve 6 and 7, then close again: Fill the plus side

completely with the medium and remove air.

4. Set measurement loop to operation

Now:
Valve 3, 6 and 7 are closed
Valves 2, 4, A and B are open

Then carry out adjustment, see below.

Measurement setup for

closed vessels

Prepare the adjustment