beautypg.com

6 wiring plan – version ip66/ip68, 1bar, 7 switch on phase – VEGA VEGAPULS 63 (≥ 2.0.0 - ≤ 3.8) Foundation Fieldbus User Manual

Page 29

background image

5

.6 Wiring plan - version IP 66/IP 68, 1 bar

1

2

Fig. 27: Wire assignment connection cable

1

brown (+) and blue (-) to power supply or to the processing system

2

Shielding

5

.7 Switch on phase

After VEGAPULS 63 is connected to voltage supply or after voltage
recurrence, the instrument carries out a self-check for approx. 30
seconds. The following steps are carried out:

l

Internal check of the electronics

l

Indication of the instrument type, the firmware as well as the
sensor TAGs (sensor designation)

l

Status byte goes briefly to fault value

Then the current measured value will be displayed and the
corresponding digital output signal will be outputted to the cable.

1)

1)

The values correspond to the actual measured level as well as to the set-
tings already carried out, e.g. default setting.

Wire assignment con-
nection cable

Switch on phase

VEGAPULS

63 • Foundation Fieldbus

29

5 Connecting to power supply

28451

-

EN

-120530