beautypg.com

Operation – Ohaus DEFENDER 5000 BENCH SCALES Relay Option Kit Manual multi User Manual

Page 12

background image

EN-10 Relay Option Kit

3. OPERATION

CAUTION: DO NOT OPERATE THE RELAY OPTION WITHOUT THE
PROTECTIVE TERMINAL COVER IN PLACE.

IMPORTANT: REVIEW THE I/O MENU BEFORE USING THE RELAY

OPTION BOARD TO CONTROL EXTERNAL DEVICES.

Refer to the instruction manual supplied with the indicator. Set up the relay controls
as described in the I/O menu section of that manual.

The indicator software allows the relays to be programmed in a variety of ways.
Optional set ups include: Normally open or normally closed simulation, on-off or on-
hold sequencing, simultaneous, break-before-make (BBM) or make-before-break
(MBB) contact switching.


External devices can be coordinated to work with the indicator’s LED displays.
• Relay Out 0 corresponds to the Yellow LED.
• Relay Out 1 corresponds to the Green LED.

• Relay Out 2 corresponds to the Red LED.