Installation – ACU-RITE DRO 200G User Manual
Page 22
DRO 200G
Installation
15
Installation
Selecting a Location
Selecting a location for the readout is an important consideration for proper
installation. Keep the following points in mind when selecting a safe and
convenient location:
•
The readout should be within reach of the operator for easy access to the
keypad.
•
The readout should be approximately at eye level.
•
Avoid moving components or tools and minimize coolant splash or spray.
•
The operating environment must be within the temperature range of 0° to 40°
C (32° to 104°F) with a non-condensing relative humidity of 25% to 85%.
Proper Mounting
ACU-RITE has developed special mounting kits for the readout which address the
most common mounting requirements. Mounting kits include:
•
Column and base machine mountings
•
Hardware and mounting instructions
These kits are available from your factory authorized ACU-RITE Distributor or
OEM/OEI.
If you fabricate a support device for the readout, it should be large enough and
strong enough to accommodate the readout. It must also be stiff enough to
minimize any vibration induced by machinery on the shop floor.
IMPORTANT
Before installing the DRO 200G readout, record the serial
number on the warranty card and return it to ACU-RITE
INCORPORATED. The serial number label is located on the
back of the readout.