Post-installation checklist, Post-installation checklist 43 – 3Com 3C16895 User Manual
Page 43
Post-installation Checklist
43
Follow the parameters defined in Table 42 for binding cables with ties.
Post-installation
Checklist
After you install your switch, use the checklist in Table 43 to verify that your switch
operates correctly.
WARNING: Confirm that you have turned off the power before checking your
installation. Improper connections can injure people or damage components of
the switch.
Table 42 Cable Binding Parameters
Cable Bundle Diameter
Space Between Bundles
10 mm (0.5in)
80-150 mm (3.5 – 6 in)
10-30 mm (.5 – 1.2 in)
150-200 mm (6 – 8 in)
30 mm (1.2 in)
200-300 mm (8 – 12 in)
Table 43 Installation Checklist
Item
Normal
Abnormal (Remarks)
Antistatic wrist strap
Console cable
Ground wire
Power cord
Fabric
I/O module
Fan frame