beautypg.com

Charger information menu – Xantrex Technology PROSINE PS3.0 User Manual

Page 34

background image

Prosine 2.5/3.0 Installation & Operation Guide

17

Section 2: Controls and Indicators

Charger Information Menu

The Charger menu displays the charging status and enables you to determine if an equalization request
is enabled. A charger override request is also available at this menu.

See

“Section 6: Multistage Charging”

(

page 59

) for a detailed description of the charging regime, and

a discussion of equalization in general. See

“ACS Configuration‚” on page 28

for detailed instructions

on setting configuration parameters using the ACS panel.

See

“ACS Configuration‚” on page 28

for details on the Equalization Request and Override Charger

Operating Mode procedure.

Table 1: Charger Status

STAGE

DESCRIPTION

Not Charging

Charger has been disabled or is on standby.

Bulk Charging

The first phase of the three-phase charging cycle has started.

Absorption Charging

Bulk charging has completed and the second phase of the
charging cycle has begun.

Float Charging

Absorption charging has completed and the charger is
‘topping-off’ and maintaining the batteries.

Equalization

The charger has started the special “equalization” stage.

CHARGER
STATE:

CHARGER STATE
OF

OVERRIDE
CHARGER

SELECT FROM:
CHARGER

EQUALIZE IS
NOW:

ENTER

EQUALIZE IS
NOW:

ENTER

This manual is related to the following products: