beautypg.com

York E2FB120 User Manual

Page 9

background image

NOTE: Use only copper tubing that has been especially

cleaned and dehydrated for refrigerant use. If the tub-

ing has been open for an extended period of time, it

should be cleaned before being used.

The liquid line connections can now be brazed while maintain-

ing a minimum flow of dry nitrogen through the piping.
NOTE: A filter-drier is factory-mounted in the outdoor unit for the

heating cycle and in the indoor unit for the cooling cycle.

Do NOT install another filter-drier in the field-supplied

liquid line because refrigerant will flow in both direc-

tions on a heat pump system.

1. The matched air handlers are shipped with a small R-22

charge and they should be checked for leaks before instal-

lation. Drill a small hole through the sealing cap or disc in

both the liquid and suction connection. If there is a pres-

sure release, the evaporator has no leaks and you can pro-

ceed with installation. If the charge has been lost, the coils

should be leak tested and the necessary repairs made.

2. Move the dry nitrogen supply from the access port on the

liquid line service valve of the outdoor unit to the hole

through the vapor disc on the indoor unit.

3. Unbraze the coil's liquid line disc while maintaining a flow of

dry nitrogen across the connection and through the hole in

the liquid line disc.

4. After the disc has been removed, burnish the external sur-

faces and clean the internal surfaces as outlined above.

5. Move the dry nitrogen supply back to the access port on the

liquid line service valve.

6. Braze the liquid line to the liquid connection on the indoor

unit while maintaining a minimum flow of dry nitrogen

through the liquid line, the indoor coil and the hole in the va-

por disc.

7. Unbraze the disc on the vapor connection of the indoor unit

while maintaining the flow of dry nitrogen.

8. After the disc has been removed, burnish the external sur-

faces and clean the internal surfaces as outlined above.

The vapor piping can now be brazedto the vapor connectionon

the indoor unit while maintaining a minimum flow of dry nitro-

gen.
Before brazing the vapor line to the outdoor unit, make sure the

refrigerant in the line has been recovered, then remove the cop-

per disc from its vapor connection per the following procedure:

1. Make sure that the vapor line service valve on the outdoor

unit is front-seated and closed with its valve stem in the

maximum clockwise position.

2. Drill a small hole through the disc before unbrazing it to per-

mit a flow of dry nitrogen through the connection while its

being unbrazed.

3. Move the dry nitrogen supply to the access port on the va-

por line service valve of the outdoor unit.

4. Unbraze the disc on the vapor line connection of the out-

door unit while maintaining a minimum flow of dry nitrogen

through the access port of the vapor line service valve and

the hole in the vapor disc.

5. After the disc has been removed, burnish the external sur-

faces and clean the internal surfaces of the vapor connec-

tion and the vapor piping.

The vapor line can now be brazed to the vapor connection on

the outdoor unit while maintaining the flow of dry nitrogen.

After the liquid and vapor lines have been installed, the system

should be evacuated and charged.

EVACUATING AND CHARGING

With the liquid and suction line service valves closed, connect

a vacuum pump through a charging manifold to the access

ports on both the liquid and suction line service valves.

NOTE: The vacuum pump connection should be short and no

smaller than 3/8" O.D.

The refrigerantlines and the evaporatorcoil can now be evacu-

ated to 500 microns without disturbing the charge in the con-

denser coil or the compressor.

After proper evacuation and dehydration, charge refrigerant

through the access port on the liquid line service valve allowing

the vacuum to draw in as much refrigerant as possible.

CAUTION: Do not charge liquid refrigerant through the com-

pressor suction connection.

CAUTION: Do not attempt to start the compressor without at

least 8 hours of crankcase heat or compressor

damage will occur.

To continue charging refrigerant, open the liquid and the suc-

tion line service valves fully. Turn the stem of the liquid service

valve clockwise 1/4 turn to open its access port for reading

pressure.

Start the compressor(after 8 hours of crankcaseheat), turn the

stem of the suctionline servicevalve clockwise1/4 turn to open

its service port and continue to charge refrigerant gas through

this suction access port until you meet the conditionsshown on

the charging curve, Fig. 8.

Open the liquid and vapor line service valves fully to close their

access ports after the system has been charged.

Alternate Charging Methods

If you are starting a unit when the ambient temperature is

higher or lower than those shown in Fig. 8, either of the follow-

ing methods may be used.

Method 1: Determine the total weight of the refrigerant for the

total system by adding the required charge for the

outdoor unit, the indoor unit and the refrigerant

lines using information in Tables 2 (Physical Data)

and 6 (Refrigerant Line Charge). Using the charg-

ing procedures outlined above, weigh the required

amount of refrigerant charge into the unit.

Method 2: Install a field supplied moisture indicating sight

glass in the liquid line between the filter-drier and

the evaporator coil.

Using the charging procedure outlined above,

charge refrigerant until the moisture indicating

sight glass is clear. Add approximately 1 extra

pound of refrigerant to assure a liquid refrigerant

seal at the expansion valve under all operating

conditions. Block the flow of the condenser air, if

necessary, to assure a head pressure of 280 psig

during the charging procedure.

NOTE: The installer should return to the job to verify the oper-

ating charge when the ambient temperature is within

the conditions shown in Fig. 8.

Unitary Products Group

9

035-15410-002-B-0404

This manual is related to the following products: