Installation – Waterford Appliances E65-NG1 User Manual
Page 13
Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove
13
INSTALLATION
RIGID PIPE VENTING - VERTICAL TERMINATIONS
FOR BOTH RESIDENTIAL & MANUFACTURED HOMES/MOBILE HOMES
The shaded areas in the two diagrams below show all allowable combinations of straight vertical and offset to vertical runs with
vertical terminations. Maximum t w o 45
o
elbows, not including the 45
o
elbow attached to the unit. All vertical and offset to vertical
vent installations require Vent Restrictor #1. If the vent is ENCLOSED in a chase (min. size 9" x 9") maintain a 1-1/4" clearance to combustibles.
Offset to Vertical Terminations
(Vent Restrictor #1)
Straight Vertical Terminations
(Vent Restrictor #1)
Rigid Pipe Venting - Horizontal Terminations
Only for Units Converted to Lower Btu Rating: 27,000 (NG), 29,000 (LP)
The two diagrams below show all allowable combinations of straight horizontal termination with one 45
o
elbow off the unit.
Dura-Vent Snorkel Termination
Riser Vent Termination