Preparation 1 - turning power on, Turning power on, P.33 “preparation 1 - turning power on – Toshiba 165 User Manual
Page 35
Preparation 1 - Turning Power ON 33
Preparation 1 - Turning Power ON
Turning power ON
1
Open the power switch cover, and then press the power switch to
“ ” (ON) side.
The equipment starts warming itself up. The warm-up time takes approx. 25 seconds.
When the warm-up has finished, the equipment is ready for copying. “READY” appears
on the LCD screen.
If you place an original and press the [START] button during the warm-up, copying auto-
matically starts when the warm-up has finished (= auto job start). When the job is
reserved, “Auto Start” appears on the LCD screen.
2
The LCD screen below is shown if the equipment is managed under
the department code function. Key in the department code.
Key in a 5-digit department code, and then press the [ENTER] button. Then the
equipment is ready for copying.
If the department code function is enabled, press the [FUNCTION CLEAR] button after
any operation has been finished to prevent unauthorized use of the equipment.
For the details of the department code, see the following page:
Turning power OFF
Open the power switch cover, and then press the power switch to “
” (OFF) side.
READY
1
100%
NONSORT
ZOOM
FINISHING
EDIT
Enter DEPARTMENT CODE
1
100%
NONSORT
ZOOM
FINISHING
EDIT