beautypg.com

Power management (pwmgt), Installer, Installation menu – Russound SIX-SOURCE CONTROLLER CAM6.6 User Manual

Page 59

background image

59

INSTALLER

INSTALLATION MENU

2. FACTORY INIT

WARNING: This procedure returns the controller to its

(FInit)

original settings - use with discretion.

Factory Initialization allows the installer to erase all programmed
settings and returns the settings to the factory default settings.
All settings including source equipment IR commands will need to
be reentered. An “Are you sure?” prompt and a “no” response
allows the installer to cancel the reset; a “yes” at the prompt will
load factory/default settings.

POWER MANAGEMENT (PwMgt)

The CAM6.6 is capable of managing the power state of the connected source equipment. The power
management is configured on a source-by-source basis.

All sources that have power management enabled are initialized by a “POWER ON” command or
macro. Power management is initialized when the first keypad is turned on or when the home theater
trigger input has 12VDC present. The 12VDC trigger output is turned on when the first zone is
turned on.

All sources that have power management enabled are turned off by the “POWER OFF” command after
all zones have been turned off, with a timeout of five minutes.The 12VDC trigger output is turned off
one minute after that. This timeout is postponed for as long as the home theater trigger input has
12VDC present.

See Power Management - Flow Chart on page 73

1. SOURCE NUM

Select the source number this feature will be configured for.

(Src #)

2. POWER ON CMD –

Tells the controller to turn on the selected source equipment (by

(OnCmd)

SOURCE NUMBER) when any of the UNO System Keypads is
turned on. If “no,” procedure advances to POWER OFF CMD (step 6)

3. COMMAND TYPE

Select the type of source command (e.g., CD, TV, etc.).

(CmdTp)

a. Selected: Learned IR

Choose Learned IR if the pre-programmed IR code library does

(LrnIR)

not support the source component.

i. LEARNED SRC –

Select the learned source bank to be assigned to the source

(LnSrc)

component. Procedure advances to KEY FUNCTION (step 5)

b. Selected: Unassigned

The Power On command is cleared. Procedure advances to

(Unasg)

POWER OFF CMD (step 6)

(continued)

This manual is related to the following products: