Operation, Opera t ion – Rhinotek F-4243C User Manual
Page 71
OPERATION
1625 01/11
Operation Section 4-17
© 2011 Alamo Group Inc.
OPERA
T
ION
FRONT END LOADER PRE-OPERATION Inspection
Front End Loader ID#_______________Make____________________
Date_____________________________Shift____________________
Before conducting the inspection, make sure the tractor engine is off, all
rotation has stopped and the tractor is in park with the parking brake
engaged. Make sure the Loader is resting on the ground or securely blocked
up and all hydraulic pressure has been relieved.
Operator’s Signature:
Item
Condition at
Start of Shift
Specific Comments if
not O.K.
The Operator’s Manual is in the Canister on the Loader
All Safety Decals are in place and legible
The Mounting frame bolts are in place and tight
The Loader Arms are securely retained in frame mounts
The Loader connection bolts & pins are tight
There are no cracks in Loader Arms or Mounts
The Attachment pins are in place and secure
The Bucket Quick Attach pins pass through the attachment
The Bucket Quick Attach control levers are in the lock position
The Hydraulic Cylinder pins are secured
The Hydraulic hose connections are tight
The Hydraulic Valve hose connections are tight
There are no leaking or damaged hoses
There is no evidence of Hydraulic leaks
The Control Valve Lock functions correctly
The Pivot Pins are properly lubricated
The Loader Storage Stands are in good condition
DO NOT OPERATE an UNSAFE TRACTOR or FRONT END LOADER