beautypg.com

Ab c – Rinnai DIRECT VENT FIREPLACE RHFE-750ETRA User Manual

Page 21

background image

Rinnai Corporation RHFE-750ETRA 21

2. Assemble and Adjust the Sleeve Length

Measure wall thickness through previously drilled
3 1/2 inch (90 mm) hole.
The end of the sleeve should protrude 3/16 - 3/8
inch (5-10 mm) from the outside wall.
In the FOT-203 (Vent Kit A) there are 4 parts
provided with which to assemble the sleeve. Use
the table to determine which pieces to assemble.
In both kits, two parts are threaded for additional
adjustment.
Adjust the sleeve length to wall thickness plus
3/16 - 3/8 inch (5-10 mm).

Sleeve Parts

a

b

c

For wall thickness plus 3/16 - 3/8 in (5-10 mm)

Assemble these parts (“A” Vent Kit)

4 1/3 - 6 1/8 in (110 - 155 mm)

6 1/8 - 7 3/4 in (155 - 195 mm)

7 3/4 - 9 1/2 in (195 - 240 mm)

a

b

+

a

b

c

+

+

a

b

c

+

+

c

+

Venting

3. Attach the sleeve

Attach to the inside wall using 3 screws arranging

the flange so that the marking “TOP” is at the top.

The flange is offset 2° to allow the condensate to

drain to the outside.

4. Install the Terminal

Check that the terminal seal is in place. For
weatherboard or vinyl siding, add the second seal
next to the terminal seal to compensate for the
angle.

From the outside insert the terminal into the
sleeve with the marking “TOP” at the top. The left
hand side locking tie should be marked “LEFT”.

3 screws

sleeve should extend
3/16 - 3/8 in (5-10 mm)

Locking tie

Terminal

Terminal seal