Nortel Networks HotWire 8600 User Manual
Page 61

Index
IN-2
8600-A2-GN20-20
October 1997
I
installation site consideration, 2-3
installation tasks
connecting to a modem for remote management,
connecting to a POTS splitter, 2-23
connecting to a terminal or computer, 2-26
connecting to an MDF, 2-23
connecting to an SNMP management system, 2-25
connecting to Ethernet hubs or switches, 2-24
installing the DSL cards, 2-19
supplying power, 2-13
verifying the installation, 2-21
installing the chassis
rack with threaded screw holes, 2-10
rack without threaded screw holes, 2-12
interconnecting the stack, 2-5
L
LEDs
power, 4-1
M
Main Distributing Frame (MDF), 2-23
making cable connections, 2-22
Management Communications Controller (MCC) card,
management information bases (MIBs), 1-4
Media Access Control (MAC) address, 2-19, 2-20
N
National Equipment Building Standards (NEBS), 2-7
O
operating environment specifications, C-2
P
package contents
pinouts
8-pin modular asynchronous terminal, B-3
DB25 adapter, B-3
LAN/WAN connectors, B-2
management 10BaseT connector, B-1
management IN and OUT connectors, B-2
Telco 50-pin for DSL loops and POTS splitters, B-4
POTS Splitter, 1-1, 2-23
power
using a single dc power source, 2-13
using ac power with dc power backup, 2-16
using only ac power source, 2-16
using two dc power source, 2-14
power redundancy, 1-4
pre-installation considerations, 2-3
R
rack mounting
with threaded screw holes, 2-10
without threaded screw holes, 2-12
remote configuration setup instructions, 3-1
Remote Termination Unit (RTU), 1-1
removing card