Locate the SVP Server

The SVP Server measures approximately 4 x 12.5 x 7 inches, and

weighs about five pounds. The unit can be wall- mounted, vertically

or horizontally, over ¾" plywood. The SVP Server can also be rack-

mounted using a rack- mount kit (sold separately).
Locate the SVP Server in a space with:

Sufficient backboard mounting space (for wall mount) and

proximity to the LAN access device (switched Ethernet hub) and

power source.

Easy access to the front panel, which is used for cabling.

A maximum distance of 325 feet (100 meters) from the Ethernet

switch.

Install the SVP Server

The SVP Server may be mounted on a rack or to a wall.

Mount the SVP Server on a rack

The rack-mount kit is designed for mounting equipment in a standard

19- inch rack and should contain the following equipment:

Mounting plates

– two for each SVP Server to be mounted.

Screws

– four rack-mount screws for each SVP Server to be

mounted.

To rack-mount the SVP Server:
1. Remove the corner screws from the SVP Server.
2. Screw the U-shaped end (round screw holes) of the two mounting

plates to the SVP Server.

3. Screw the other end of the two mounting plates (oblong screw

holes) to the rack.

4. Repeat steps 1-3 for each additional SVP Server. The mounting

plate is designed to provide the correct minimum spacing

between units. When mounting multiple units, stack the units in

the rack as closely as possible.