beautypg.com

Start-up – Lochinvar Knight Wall Mount Soiler 51-211 User Manual

Page 58

background image

58

Installation & Operation Manual

10

Start-up

Check for gas leaks

Before starting the boiler, and during
initial operation, smell near the floor and
around the boiler for gas odorant or any
unusual odor. Remove the front access
panel and smell the interior of the boiler
enclosure. Do not proceed with startup
if there is any indication of a gas leak.
Use an approved leak detection solution.
Repair any leaks at once.

DO NOT adjust gas valve outlet pressure.
The gas valve is factory set for the correct
outlet pressure. This setting is suitable
for natural gas and propane, requiring
no field adjustment. Attempting to
alter the gas valve outlet pressure could
result in damage to the valve, causing
potential severe personal injury, death, or
substantial property damage.

Propane boilers only – Your propane
supplier mixes an odorant with the propane
to make its presence detectable. In some
instances, the odorant can fade, and the
gas may no longer have an odor. Before
startup (and periodically thereafter), have
the propane supplier verify the correct
odorant level in the gas.

Check thermostat circuit(s)

1. Disconnect the two external wires connected to each of the

heat/loop demand terminals on the connection board.

2. Connect a voltmeter across these two incoming wires.

Close each thermostat, zone valve, and relay in the external
circuit one at a time and check the voltmeter reading across
the incoming wires.

3. There should NEVER be a voltage reading.

4. If a voltage does occur under any condition, check and

correct the external wiring. (This is a common problem
when using 3-wire zone valves.)

5. Once the external thermostat circuit wiring is checked and

corrected if necessary, reconnect the external thermostat
circuit wires to the connection board.

Inspect/fill condensate system

Inspect/check condensate lines and fittings

1. Inspect the condensate drain line, condensate PVC fittings

and condensate trap.

Fill condensate trap with water

1. Remove the bezel as depicted in FIG. 8-1 on page 52 of this

manual.

2. Remove the PVC cap retaining screw from the PVC cap

(FIG. 10-1).

3. Remove the 2 inch PVC cap with the switch located at the

top of the trap (FIG. 10-1).

4. Fill with fresh water until the water begins to pour out of the

drain.

5. Replace the cap. Press the cap onto the trap until the cap

makes contact with the drain.

6. Replace the retaining screw.

7. Reinstall

bezel.

The condensate trap (FIG. 10-1) must be
filled with water during all times of boiler
operation to avoid flue gas emission from
the condensate drain line. Failure to fill the
trap could result in severe personal injury or
death.

Figure 10-1 Condensate Trap

ƽ WARNING

ƽ WARNING

ƽ WARNING

ƽ WARNING

Clean/Inspect Trap Assembly

1. Remove the clean out cap on the bottom of the trap. Let the

condensate and any debris drain out.

2. Refill the trap according to the instructions above.