P R E P A R A T I O N

Test Run

After all preparation steps have been completed,

the machine and its safety features must be

tested to ensure correct operation. If you discover

a problem with the operation of the machine or

its safety components, shut the machine down,

disconnect it from power, and do not operate it

further until you have resolved the problem.

A Troubleshooting section is provided, starting

on Page 84, to assist you with solutions if a

problem occurs or if the lathe does not function

as described in this section.

If you need additional help after reviewing the

troubleshooting section, or you are not confident

troubleshooting the machine on your own,

contact our Tech Support at (360) 734-1540.

To test run your machine:
1.
Make sure the master power switch (see

Figure 23) on the rear of the machine is

turned OFF.

2. Read and follow the safety instructions

at the beginning of the manual, take all

required safety precautions, and make sure

all previous preparation steps discussed

in this manual have been followed and

completed.

4. Connect the incoming ground wire to the

ground terminal directly above the master

power switch.

5. Make sure the power cord and wires have

slack between the strain relief and terminal

connections so that they do not bind, then

tighten the strain relief to secure the cord.

Note: The strain relief must be tightened against

the outer jacket of the cord. Avoid over-

tightening the strain relief or it may crush

the cord and cause a short.

6. Test the strain relief to ensure it is properly

tightened by pulling the cord from outside

the box with light-to-moderate force. When

the strain relief is properly tightened, the

cord will not move inside the cabinet.

7. Install a NEMA 15-20 plug on the other end

of the power cord per the manufacturer's

instructions.

8. Close and lock the main electrical box door.

9. Connect the plug to the matching receptacle

and power source as specified in Circuit

Requirements on Page 17.

Figure 23. Location of the master power switch.

Main Power

Switch

To avoid unexpected start-up of lathe

components, keep the master power switch

turned OFF until instructed otherwise in the

Test Run.