5 mounting, 1 overview of mounting, Mounting – Siemens Plant Central Clock TC100 User Manual
Page 32: Overview of mounting, Mounting (chapter 5)
5-
©
Siemens AG 2010 All Rights Reserved
SICLOCK
®
TC100 Operating Instructions
Mounting
5
5.1
Overview of mounting
Figure 5-1 SICLOCK TC100 - view of mounting
SICLOCK TC100 must be mounted in an easily accessible position in the control
cabinet.
The housing can be fixated by snap-on mounting to a standard mounting rail
(EN 50022-35) or to a SIMATIC S5 DIN rail (6ES5 710-8maxx).
A clearance of 100mm must be maintained above the device so that it can be
hooked in and out, and to facilitate unimpeded heat dissipation.
A clearance of at least 100mm must be maintained under the device for the pro-
cess signal plug.
We recommend mounting a suitable cable channel below this clearance.
See also Dimension drawing (Chapter 14).
Note
Ensure that the snap-on mounting is locked correctly.