Installation – Select Comfort Precision Comfort Adjustable Foundation User Manual
Page 8

Precision Comfort™ Owners Manual
8
INSTALLATION
6. Remove the plastic packaging from the
bed base frame. Carefully rotate the base
frame over to position the bed top-side-up.
7. Plug power cord into a working, grounded
electrical outlet.
Note: an electrical surge
protection device is recommended (not
included).
8. Install batteries in hand control. Briefly
activate all functions of the bed with the
hand control to verify all features are in
working order. If foundation does not
operate, refer to the Troubleshooting
section of this manual.
9. Return foundation to the level position.
2. Carefully Lift the bed base frame from the
shipping carton, keeping the unit top-side-
down.
3. Install (4) legs into the base frame. Simply
screw each leg into a tapped hole at each
corner of the base frame (FIGURE 1). Insert
casters into the bottom of each bed leg (if
applicable).
4. Remove and extend out power cord from
the protective packaging.
5. Install (2) 9 volt batteries into the receiver
unit (FIGURES 2 and 3). The DC receiver
unit is commonly referred to as a power
down box.
FIGURE 1: Precision Comfort™ leg installation. Caster
installation (if applicable).
LEGS – SCREW INTO
TAPPED HOLE AT
EACH CORNER
CASTERS – PRESS-FIT
INTO BOTTOM OF
LEGS (IF APPLICABLE)
POWER CORDS MUST NOT INTERFERE
WITH ANY ADJUSTABLE BED
MECHANISMS.
FIGURE 2: Receiver unit (power down box) battery
compartment door removal.
PRESS IN (SLIGHTLY) AND
PUSH DOWN TO REMOVE
BATTERY COMPARTMENT
DOOR
POWER DOWN BOX
BATTERY COMPARTMENT DOOR
BATTERY ORIENTATION IS
INDICATED INSIDE BATTERY
COMPARTMENT
DOOR REINSTALLATION:
PRESS COMPARTMENT DOOR
AGAINST THE BATTERY ENDS,
SLIDE DOOR UP AND IN
TO ENGAGE THE DOOR TABS
TABS
FIGURE 3: Power down box battery installation and battery
compartment door reinstallation.