Programming 1 hand control - 2 beds – Select Comfort Precision Comfort Adjustable Foundation User Manual
Page 20

Precision Comfort™ Owners Manual
20
IF PROGRAMMING FAILS, INITIATE THE
PROGRAMMING PROCEDURE A SECOND
TIME.
NOTE
The three step procedure below is required to program 1 hand control to operate 2 beds.
Before beginning, make certain the beds are plugged into a working grounded electrical
outlet.
STEP 1
Locate the power down box for bed 1 and
press the learn button for 1 second and
release (FIGURE 16).
STEP 2
On the hand control, simultaneously press
and hold the POS 1 and the head massage
on/off buttons (FIGURE 17). The
transmission indicator light will flash
slowly and then flash rapidly. Continue to
hold for 5 seconds and then release the
buttons.
STEP 3
Repeat Step 1 and Step 2 with bed 2
One hand control is now programmed to
operate two beds.
BED 1
BED 2
PROGRAMMING
1 hand control - 2 beds
LEARN
BUTTON
FIGURE 16: Power down box learn button.
POWER
DOWN BOX
POS 1
BUTTON
TRANSMISSION
INDICATOR LIGHT
FIGURE 17
HEAD MASSAGE
ON/OFF BUTTON