Programming separating 2 beds – Select Comfort Precision Comfort Adjustable Foundation User Manual
Page 22

Precision Comfort™ Owners Manual
22
PROGRAMMING
separating 2 beds
The six step procedure below is required to separate 2 hand controls from operating 2 beds.
One hand control per bed operation will result. Before beginning, make certain the beds are
plugged into a working grounded electrical outlet.
STEP 1
Locate the power down box for bed 1 and
press the learn button for 1 second and
release (FIGURE 16).
STEP 2
On hand control 1, simultaneously press and
hold the POS 1 and the head massage on/off
buttons (FIGURE 17). The transmission
indicator light will flash slowly and then flash
rapidly. Continue to hold for 5 seconds and
then release the buttons.
STEP 3
Repeat Step 1 and Step 2 with hand control 1.
Note: wait 90 seconds before proceeding to
Step 4.
STEP 4
Locate the power down box for bed 2 and
press the learn button for 1 second and
release. The bed will be equipped with
either a power down box or J box (FIGURE
16).
STEP 5
On hand control 2, simultaneously press and
hold the POS 1 and the head massage on/off
buttons (FIGURE 17). The transmission
indicator light will flash slowly and then flash
rapidly. Continue to hold for 5 seconds and
then release the buttons.
STEP 6
Repeat Step 4 and Step 5 with hand control 2.
Independent hand control operation is now
restored (hand control 1 operating bed 1;
hand control 2 operating bed 2).
HAND CONTROL 1
BED 1
HAND CONTROL 2
BED 2
IF PROGRAMMING FAILS, INITIATE THE
PROGRAMMING PROCEDURE A SECOND
TIME.
NOTE
LEARN
BUTTON
FIGURE 16: Power down box learn button.
POWER
DOWN BOX
POS 1
BUTTON
TRANSMISSION
INDICATOR LIGHT
FIGURE 17
HEAD MASSAGE
ON/OFF BUTTON