beautypg.com

Southbend STRG-5D User Manual

Page 6

background image

S

PECIFICATIONS

S

TRATO

S

TEAM

C

OUNTERTOP

S

TEAMER

E

LECTRICAL

R

EQUIREMENTS

One fused electrical connection is required to the terminal board of each steamer. All steamers are shipped per
customer order, three phase or single phase. (A kit is available for field conversion to three phase or single phase.)
The fused connection must be wired for the required voltage and maximum amperage as listed in the chart below:

Total Connected Amps

Model STRG-3D

Model STRG-5D

Voltage

1 Phase

3 Phase

1 Phase

3 Phase

120 V 60 Hz

0.37

0.37

0.37

0.37

208 V 50/60 Hz

0.21

0.21

0.21

0.21

220 V 50/60 Hz

0.20

0.20

0.20

0.20

240 V 60 Hz

0.18

0.18

0.18

0.18

G

AS

P

RESSURE

R

EQUIREMENTS

O

PERATING

Natural Gas 4" W.C.

Propane Gas 10" W.C.

I

NCOMING

Natural Gas 7" W.C. Minimum

Propane Gas 11" W.C.

W

ATER

R

EQUIREMENTS

To meet warranty requirements, the water supply must be as follows:

Connection

1/4" compression, cold water

Pressure

30 to 60 PSI

Total Dissolved Solids (TDS)

60 PPM or less

Hardness

2 grains (35 PPM) or less

pH

7.0 to 7.5

Maximum Fill Capacity

0.87 gallons

Typical usage is 0.46 gallons per minute at 45 PSI.

In order to minimize service problems and to meet the warranty requirements, a water treatment system (softener) is
recommended when water quality does not meet the limits stated above.

D

RAIN

R

EQUIREMENTS

The drain outlet has a 1" NPT female connector. Do NOT directly connect the drain to a plumbing system unless you
also install an “open funnel” downstream of this connection (see Figure 7 on page 17). There must be no back-flow or
back-pressure into the drain connection!

P

AGE

6

OF

50 O

WNER

S

M

ANUAL

1185290