Connections and components – SMC Networks Barricade User Manual
Page 6
Page 3
Connections and Components
All connections and switches are on the rear panel. Please take a few minutes to fa-
miliarize yourself with your new Barricade.
Figure 1: Barricade Rear Panel
Power Switch
This is a spring-loaded "Soft Switch".
If Off, press once to turn On.
If On, press once to start the Disk Shutdown sequence.
During Shutdown, the Ready LEDs will blink.
100Base LEDs
These LEDs match the LAN (Hub) connectors. If the
matching LAN connector is using 100BaseT, the LED will
be ON. If using 10BaseT, the LED will be OFF.
LAN (Hub) ports
These Ethernet connectors are for the PCs and other devices
on your LAN. Both 10BaseT and 100BaseT connections can
be used simultaneously.
Note: If Port 7 is used, then the "Uplink" port (see below)
can NOT be used.
Uplink Port
Use this port only to connect to a standard port on another
Hub. The other Hub can be either 10BaseT or 100BaseT.
Note: If the "Uplink" port is used, then Port 7 can NOT be
used.
Link LEDs
These LEDs match the LAN (Hub) connectors. If the
matching LAN connector is in use, the LED will be ON.
Power Input
Connect the supplied power adapter here.