beautypg.com

Maintenance schedule, Ongoing, Before beginning operations – Southbend SOUTH BEND LATHE CO.. SB1024 User Manual

Page 51: Daily, after operations

background image

For Machines Mfg. Since 8/09

SB1024/SB1025/SB1026

-49-

M A I N T E N A N C E

Maintenance Schedule

Each operator of this machine is responsible
for ensuring proper care of the equipment. We
strongly recommend that all operators make
a habit of following the daily maintenance
procedures.

For optimum performance from this machine,
this maintenance schedule must be strictly
followed. Use the Monthly Maintenance Chart
on Page 50 to ensure this is done.

Ongoing

To maintain a low risk of injury and proper
machine operation, if you ever observe any of the
items below shut the machine down immediately,
disconnect it from power, and fix the problem
before continuing operations.

s

,OOSE

s

7ORN

s

%MERGENCY

s

-ISSING

s

2EDUCTION

s

#OOLANT

s

!NY

Always disconnect
machine from power before
performing maintenance or
serious personal injury may
result.

!

Before Beginning Operations

s

-AKE

s

4URN

s

-OVE

s

-AKE

s

#HECK

s

0ERFORM

s

#HECK

Daily, After Operations

s

0USH

s

6ACUUMCLEAN

s

7IPE

This manual is related to the following products: