Operating procedure photos – MITSUBISHI ELECTRIC MSZ-FD25VAS User Manual
Page 39
39
6. Removing the horizontal vane motor
(1) Remove the nozzle assembly.(Refer to 4.)
(2) Remove the screws of the horizontal vane motor unit, and
pull out the horizontal vane motor unit.
(4) Remove the screws of the horizontal vane motor unit
cover.
(5) Remove the horizontal vane motor from the horizontal
vane motor unit.
(3) Disconnect the connector from the horizontal vane motor.
7. Removing the indoor fan motor and the line flow fan
(1) Remove the panel (Refer to 1.) and the corner box.
(2) Remove the sensor holder, the power monitor receiver P.C.
board holder, the electrical box (Refer to 3.) and the nozzle
assembly (Refer to 4.).
(4) Remove the screws fixing the motor bed. (See Photo 10)
(5) Loosen the screw fixing the line flow fan. (See Photo 11)
(6) Remove the motor bed together with fan motor and motor
band.
(7) Release the hooks of the motor band. Remove the motor
band. Pull out the indoor fan motor.
(8) Remove the indoor coil thermistor from the heat exchang-
er.
(
w
) Install the indoor coil thermistor (RT12) in its former posi-
tion when assembling it. (Refer to Photo 13)
(9) Remove the screws fixing the left side of the heat
exchanger. (See Photo 12)
(10) Lift the heat exchanger, and pull out the line flow fan to the
lower-left.
Photo 9
Photo 10
Photo 12
Photo 11
OPERATING PROCEDURE
PHOTOS
Screws of the horizontal
vane motor unit cover
Screws of the horizontal vane motor unit
Photo 13
Motor band
Screws of
the motor bed
Screw of
the line flow fan
Screws of the
left side of the
heat exchanger
Indoor coil thermistor (RT12)
OBH488-2.qxp 07.8.9 11:49 AM Page 39