Setup and installation – MGE UPS Systems STS 600A User Manual

Page 29

background image

Setup and Installation

2.0

Scope

Setup and Installation guides the User through tools and equipment required for making hardwire connections.
Included are power cable connections with wire diagrams for configuring the product to specifications, and
obtaining MGE field service assistance for final installation and startup.

Final installation and start-up should be completed and performed by a qualified MGE Field Service
Engineer.

CAUTION

Scheduling of the MGE Field Service Engineers typically should be

done 7 to 10 days before they are required on-site. If the startup of

the UPS is critical to maintaining your schedule, please call the

MGE toll free telephone number at 1-800-438-7373 for assistance.

To insure a successful installation, each of these (5) steps should be followed in their correct sequence.

Note that any unauthorized installation may cause damage to the UPS(s) and void the MGE warranty.

First steps by an on-site qualified Technical Engineer

Step 1.

Unpack and position the unit

Step 2.

Connect the main (utility) power

Step 3.

Connect the output to the power distribution panel

Step 4.

The MGE Field Service Engineer finalizes installation and the startup process.

Optional:

Procedure for temporary power prior to the final startup.

Required Equipment and Tools

The following equipment and tools are recommended for on-site installation:

Digital volt meter (DVM)

1/8 inch slotted screwdriver

Pallet jack/forklift

Conduit installation tools

Nut driver set

2 — 1

86-504004-00 B03

Installation