Installation and User Manual

1.6

Single Line Diagram

During normal operation, CB1, 2, 3A and 3B (if installed) are closed and the load receives power from the
designated preferred source through either SW1 or SW2 SCR switch. In the event of a preferred source failure, the
STS will transfer the load to the alternate source in a fraction of a cycle. If bypassed by closing either CB4 or CB5
bypass switch, CB1, 2, 3A and 3B (if installed) are opened, isolating the static switch section for maintenance.

Figure 1-4: Single Line Diagram, Epsilon STS

TM

with Options.

Introduction

1 — 7

86-504004-00 B03

CB1

A

SOURCE

#1

SW1

B
C

A
B
C

N

G

CB4

CB2

A

SOURCE

#2

SW2

B

C

A
B
C

N

G

CB5

N

G

AC-DC PS 1

AC-DC PS 2

AC-DC PS 3

TVSS 1

(OPTION)

FUSE

CONTROLS

TVSS 2

(OPTION)

FUSE

CB3A

CB3B

(OPTION)

A

TO

CRITICAL

LOAD

B
C

A
B
C

N

G

OUTPUT

SOURCE

S1

INPUT

SOURCE

S2

INPUT

STS CABINET

CB CONTROL

EPO PS

EPO

SHUNT TRIPS

BYPASS LEDs

1

TB1

2 3 4

EPO

(SEE SECTION 2.5.2.1)

SOURCE LOSS TEST

(SEE SECTION 2.5.2.2)

COMMUNICATIONS

RELAY

CARD

(SEE SECT. 2.5.3)

JBUS/MODBUS

CARD

(SEE SECT. 2.5.4)

OPTION

CARD

OPTION

CARD