Installation and user manual, Step 4 arrival of mge field engineer – MGE UPS Systems STS 600A User Manual
Page 15
Installation and User Manual
Figure QS-4 400/600A STS Input/Output Power Connections.
Step 4 Arrival of MGE Field Engineer
The MGE Field Engineer will finalize the initial Epsilon STS™ start-up. To insure a successful installation and
reliable STS service, the MGE Field Engineer will verify all of the installation connections, fusing, and then will
examine the extensive set of Epsilon STS™ personalization parameters to insure that the operation of the STS
exactly matches your installation requirements.
Quick start
QS —5
86-504004-00 B03
CONTROL WIRES
THREADED THROUGH
UNIT
CONTROL WIRE
PANDUIT/WIRE-WAYS
TOP ENTRY
CONDUIT PLATE
BRACE AT
12" INTERVALS
BOTTOM ENTRY
CONDUIT PAN
COMMUNICATION
CARDS
TB1
TERMINAL
CONTROL WIRES
CONTROL WIRE
PANDUIT/WIRE-WAYS
This manual is related to the following products: