Goodman Mfg CPH COMMERCIAL SS-CPH90-150 User Manual
Page 27
26
www.goodmanmfg.com
SS-CPH90-150
SS-CPH90-150
www.goodmanmfg.com
27
P
roduct
S
PecificationS
P
roduct
S
PecificationS
r
oof
C
urB
i
nstallation
(
Cont
.)
Curb installations must comply with local codes and should follow the established
guidelines of the National Roofing Contractors Association.
Proper unit installation requires that the roof curb be firmly and permanently
attached to the roof structure. Check for adequate fastening method prior to
setting the unit on the curb.
Full perimeter roof curbs are available from the factory and are shipped
unassembled. The installing contractor is responsible for field assembly,
squaring, leveling, and mounting on the roof structure. All required hardware
necessary for the assembly of the sheet metal curb is included in the curb
accessory package.
• Determine sufficient structural support before locating and mounting the
curb and package unit.
• Duct-work must be constructed using industry guidelines. The duct-work
must be placed into the roof curb before mounting the package unit. Our full
perimeter curbs include duct connection frames to be assembled with the
curb. Cantilevered-type curbs are not available from the factory.
• Contractor furnishes curb insulation, cant strips, flash-
ing, and general roofing material.
• Support curbs on parallel sides with roof members. To
prevent damage to the unit, the roof members can-
not penetrate supply and return duct openings.
Note: The unit and curb accessories are designed to allow
vertical duct installation before unit placement. Duct
installation after unit placement is not recommended.
See the manual shipped with the roof curb for assembly
and installation instructions.
3-d V
iew
15⅜ x 31⅛
Supply Opening
14⅝ x 38⅜
Return Opening
92¼
53¼
14
1⅝
¾
14
1⅜
P
ower
and
l
ow
-V
oltage
B
loCk
l
oCations
Power Wiring
Thermostat
Wiring
t
oP
V
iew