beautypg.com

Installation instructions, Installation / commissioning, Lighting the fire – Stovax PR0696 User Manual

Page 17: Commissioning

background image

17

INSTAllATION INSTRUCTIONS

INSTAllATION / COMMISSIONING

11. lIGhTING ThE FIRE

11.1 Locate the control valve on the appliance. There are two

control knobs on the valve, the right hand knob controls

the pilot ignition and the left hand knob controls the main

burner.

11.2 If your appliance has already been upgraded to battery

remote control, please refer to the instructions provided

with the upgrade to operate the remote control. The

following instructions will work for either situation.

1

AR0914

11.3 Ensure that the left-hand control knob is pointing to off ( ).

11.4 Ensure that the right hand control knob is pointing to off ( ).

11.5 Press in the right hand control knob and rotate it anti-

clockwise until a click is heard (keep pressing in) and the

knob is pointing to pilot ( ). The pilot should now light.

If the pilot has not lit, repeat the procedure until it does.

11.6 Keep the control knob pressed for 10 seconds and then

release it, the pilot should stay alight. If the pilot goes out,

repeat the procedures until it does.

11.7 If the pilot will not light after repeated attempts, contact the

retailer or installer from whom the appliance was purchased.

11.8 Turn the right hand control to point to main burner (

).

The

appliance can now be controlled using the left hand control

knob.

11.9 Turn the left hand control knob to point to low fire (

),

the main burner will light on low. The burner can now be

controlled between low and high settings. Turn the control

knob anti-clockwise increase the flame height and clockwise

to decrease the flame height.

ThE YEllOW FlAMES WIll APPEAR WhEN ThE FIRE hAS

GAINED SUFFICIENT hEAT - TYPICAllY 10 TO 20 MINUTES.

1. COMMISSIONING

1.1 Close all windows and doors to the room, check all controls,

and allow fire to burn on maximum for 5 minutes. Test for

spillage of flue products using a smoke match. Pass the

lighted smoke match along the top front edge just inside the

opening or canopy. See diagram 1.

1

AR0726

Hotbox

Convector

1.2 If the fire spills, run for a further 10 minutes and re-check. If

the flue restrictor plate has been fitted to the fire this can be

removed to assist flue flow if required. ( Convector only)

1.3 If there are extractor fans in the room or adjacent rooms, the

spillage test must be repeated with the extractors running on

maximum.

IF SPIllAGE PERSISTS, DISCONNECT ThE APPlIANCE

AND SEEk EXPERT ADvICE.

For future reference record the installation details on the

commissioning sheet on page 3 of these instructions.