beautypg.com

Installation instructions, Electrical data, Before you begin tools you will need – Friedrich ZStar ZQ08 ZQ10 User Manual

Page 9: English

background image

ENGLISH

8

Installation Instructions

Electrical Data

NOTE TO INSTALLER: Leave these
instructions with the air conditioner after
installation is completed.

NOTE TO CONSUMER: Keep this Installation
and Operation Manual for future use.

Important notes:

It is recommended that proper attire be worn
during installation.
For personal safety, this air conditioner must
be properly grounded.
It is important to have the wall outlet and circuit
checked by a qualified electrician if there is any
doubt as to whether a proper ground exists.

CAUTION:

Do not under any circumstances, cut or remove
the third (ground) prong from the power cord.

Do not change the plug on the power cord of
this air conditioner.

Aluminum house wiring may present special
problems–consult a qualified electrician.

Phillips-head screwdriver

Flat-blade screwdriver

Ruler or tape measure

Scissors or knife

Pencil

Level

Hammer

Before You Begin

Tools You Will Need

Read these instructions completely and carefully.

Line Cord Plug

Use Wall Receptacle

Power Supply

Power supply cord with
3-prong grounding plug

Use 15 AMP time
delay fuse or circuit
breaker.

Standard 125V, 3-wire grounding
receptacle rated 15A, 125V AC