Oil reservoir – Wheatheart Self-Propelled Post Pounder Kit User Manual
Page 25

W
HEATHEART
- S
ELF
-P
ROPELLED
P
OST
P
OUNDER
K
IT
4. I
NSTALLATION
T
RAILER
P
OST
P
OUNDER
M
ODEL
4.6. O
IL
R
ESERVOIR
IM12 R3
25
4.6. OIL RESERVOIR
1. Drain oil and remove existing oil
reservoir (not shown).
2. Insert the SP oil reservoir on the
bracket and bolt it in place with four
3/8” x 1” bolts and 3/8” nuts.
3. Align the bracket and tank assembly so
the tank clears the post bin by approxi-
mately 1-7/8” (Figure 4.10).
4. Tack the new bracket on the post bin,
ensure it is even with the bottom and
back end.
5. Make sure the bracket is level and weld
it solid.
Figure 4.10
Note:
Tank hydraulic fittings must face toward the motor mount.
Figure 4.9
SP KIT OIL
RESERVOIR
3/8” NUT
3/8” x 1” BOLT
BRACKET
POST
BIN
1-7
/8”