3.2. TRANSPORT PREPARATION
1. Remove the safety pin under the hitch and lift
the arm up into transport mode (Figure 3.3).
Replace pin.
2. Fully disengage the wheel drive over-centers
(Figure 3.5) and lock into position with the
chain lock.
3. Raise spike and install cylinder lock with
1/4” X 3” locking pin (see Figure 3.6).
4. Adjust valve position by loosening the
appropriate bolt. Swing into transport position
and lock in place.