Providing Proper Electrical Service


The system is completely pre-wired and tested at the factory, and a hard-wired
connection from an appropriate power source junction box is all that is required.


The installer is to provide a disconnect that should be incorporated in the fixed
wiring.
Properly sized watertight conduit, fittings and parts are required, as well as the
appropriate gauge wire.

If your system is a “left-to-right” unit, you should locate the power source junction
box at t

he left end of the system. (The opposite would be true for a “right-to-left”

system.)

Ideally, the junction box should be located on the wall directly behind the pump
motor and control panel.

Specific part numbers and part information can be obtained from the factory by
calling 800-444-9624.

Plumbing Requirements


Your unit requires the following plumbing connections:

3/4” (19mm) or 1/2” (12 mm) hot and cold water supply lines.

One wastewater connection (minimum 1 1/2” / 38mm).