Service reference manual sequence of operations – Armstrong World Industries HWC PREMIER 183 User Manual
Page 19
Service Reference Manual
SEQUENCE OF OPERATIONS
2-9
SRM-HW/HWC 2/99
6.
After the 90-second delay, the
ignition control
de-
energizes the cooling speed relay and the
circulat-
ing air blower
stops.
FAN ON
1.
When the
thermostat
is switched to the “FAN ON”
position, the
R-G
circuit sends a 24-volt signal to
pin 4 of the 5-pin thermostat harness.
2.
The 24-volt signal energizes the cooling speed
relay, sending L1 power to the
ACB COOL
terminal
of the
ignition control
.
3.
L1 power is sent to the
circulating air blower
terminal block, causing the
circulating air blower
to run in cooling speed.
4.
The
circulating air blower
continues to run in
cooling speed until the
thermostat
is switched to
“AUTO”, interrupting the
R-G
circuit.
Note: With the
thermostat
in the “FAN ON” position
during heat call,
ignition control
will not energize
the heat speed relay. The
circulating air blower
continues to run in cooling speed unless the
limit
switch
circuit opens, which would cause the heat
speed relay and the
induced draft blower
relay
to become energized. This would de-energize the
cooling speed relay until either the
limit switch
circuit is closed or the
thermostat
is switched to
the “AUTO” position.