beautypg.com

Prochem Apex GTX User Manual

Page 6

background image

4

Receiving Your Unit

Acceptance Of Shipment

Every part of your cleaning unit was carefully checked,
tested, and inspected before it left our manufacturing
plant. Upon receiving the unit, make the following
acceptance check:

1. The unit should not show any outward signs of

damage. If damaged, notify the common carrier
immediately.

2. Check your equipment and packing list. The

standard cleaning unit should arrive equipped with
the following items (unless otherwise specified)
and any optional accessories which were ordered:

Equipment List:

1. Console.

2. Waste tank

3. Fuel pump assembly

4. 150 ft. of 2" vacuum hose.

5. 2 vacuum hose connectors.

6. 150 ft. of 1/4" high pressure hose with quick

connects.

7. 50 ft. water supply hose with quick connect.

8. Installation bolting kit.

9. Installation mounting plates.

10. Operation and service manuals for engine, solution

pump, and vacuum pump.

11. Hose clamps for fuel and vacuum hoses.

86341750 APEX GTX